(a) In general Subject to the availability of appropriations, the Secretary may provide loan guarantees for a project to produce energy from coal of less than 7,000 Btu/lb. using appropriate advanced integrated gasification combined cycle technology, including repowering of existing facilities, that
(1) is combined with wind and other renewable sources;
(2) minimizes and offers the potential to sequester carbon dioxide emissions; and
(3) provides a ready source of hydrogen for near-site fuel cell demonstrations.
(b) Requirements The facility
(1) may be built in stages;
(2) shall have a combined output of at least 200 megawatts at successively more competitive rates; and
(3) shall be located in the Upper Great Plains.