(C) Minimum requirements At a minimum, the Secretary shall require under subparagraph (A) that an application for a grant include
(i) a description of the project proposed in the application;
(ii) an estimate of the production increase and the duration of the production increase from the project, as compared to conventional recovery techniques, including water flooding;
(iii) an estimate of the carbon dioxide sequestered by project, over the life of the project;
(iv) a plan to collect and disseminate data relating to each project to be funded by the grant;
(v) a description of the means by which the project will be sustainable without Federal assistance after the completion of the term of the grant;
(vi) a complete description of the costs of the project, including acquisition, construction, operation, and maintenance costs over the expected life of the project;
(vii) a description of which costs of the project will be supported by Federal assistance under this section; and
(viii) a description of any secondary or tertiary recovery efforts in the field and the efficacy of water flood recovery techniques used.