| NNM06AB17T | 1 | | | R425: Engineering And Technical Services | ($20,496.00) | 2006 | 8291991 |
| NNM06AB17T | | | | R425: Engineering And Technical Services | $250,030.00 | 2006 | 9392118 |
| NNM07AA15T | | | | R425: Engineering And Technical Services | $204,406.00 | 2007 | 12809069 |
| NNM06AB17T | 3 | | | R425: Engineering And Technical Services | $847,936.00 | 2007 | 12825263 |
| NNM06AB17T | 4 | | | R425: Engineering And Technical Services | $146,959.00 | 2007 | 13603994 |
| NNM06AB17T | 5 | | | R425: Engineering And Technical Services | $149,996.00 | 2007 | 13783880 |
| NNM06AB17T | 7 | | | R425: Engineering And Technical Services | $318,881.00 | 2007 | 14533349 |
| NNM06AB17T | 2 | | | R425: Engineering And Technical Services | $99,798.00 | 2007 | 15643734 |
| NNM06AB17T | 6 | | | R425: Engineering And Technical Services | $109,927.00 | 2007 | 15921697 |
| NNM06AB17T | 8 | | | R425: Engineering And Technical Services | $0.00 | 2008 | 19789639 |
| NNM08AB65T | | | | R425: Engineering And Technical Services | $125,866.00 | 2008 | 19977835 |
| NNM08AB65T | 3 | | | R425: Engineering And Technical Services | $19,261.00 | 2009 | 21098730 |
| NNM09AB21T | 1 | | | B599: Other Special Studies And Analyses | $0.00 | 2009 | 21223146 |
| NNM08AB65T | 2 | | | R425: Engineering And Technical Services | $0.00 | 2009 | 21362863 |