TITLE 33 - US CODE - SUBCHAPTER II - HARBOR DEVELOPMENT

33 USC 2231 - Studies of projects by non-Federal interests

(a) Submission to Secretary 
A non-Federal interest may on its own undertake a feasibility study of a proposed harbor or inland harbor project and submit it to the Secretary. To assist non-Federal interests, the Secretary shall, as soon as practicable, promulgate guidelines for studies of harbors or inland harbors to provide sufficient information for the formulation of studies.
(b) Review by Secretary 
The Secretary shall review each study submitted under subsection (a) of this section for the purpose of determining whether or not such study and the process under which such study was developed comply with Federal laws and regulations applicable to feasibility studies of navigation projects for harbors or inland harbors.
(c) Submission to Congress 
Not later than 180 days after receiving any study submitted under subsection (a) of this section, the Secretary shall transmit to the Congress, in writing, the results of such review and any recommendations the Secretary may have concerning the project described in such plan and design.
(d) Credit and reimbursement 
If a project for which a study has been submitted under subsection (a) of this section is authorized by any provision of Federal law enacted after the date of such submission, the Secretary shall credit toward the non-Federal share of the cost of construction of such project an amount equal to the portion of the cost of developing such study that would be the responsibility of the United States if such study were developed by the Secretary.

33 USC 2232 - Construction of projects by non-Federal interests

(a) Authority 
In addition to projects undertaken pursuant to sections 201 and 202 of this title, any non-Federal interest is authorized to undertake navigational improvements in harbors or inland harbors of the United States, subject to obtaining any permits required pursuant to Federal and State laws in advance of the actual construction of such improvements.
(b) Studies and engineering 
When requested by an appropriate non-Federal interest the Secretary is authorized to undertake all necessary studies and engineering for any construction to be undertaken under the terms of subsection (a) of this section, and provide technical assistance in obtaining all necessary permits, if the non-Federal interest contracts with the Secretary to furnish the United States funds for such studies and engineering during the period that they are conducted.
(c) Completion of studies 
The Secretary is authorized to complete and transmit to the appropriate non-Federal interest any study for improvements to harbors or inland harbors of the United States which were initiated prior to November 17, 1986, or, upon the request of such non-Federal interest, to terminate such study and transmit such partially completed study to the non-Federal interest. The Secretary is further authorized to complete and transmit to the appropriate non-Federal interest any study for improvement to harbors or inland harbors of the United States that is initiated pursuant to section 577 of this title or, upon request of such non-Federal interest, to terminate such study and transmit such partially completed study to the non-Federal interest. Studies under this subsection shall be completed without regard to the requirements of subsection (b) of this section.
(d) Authority to carry out improvement 
Any non-Federal interest which has requested and received from the Secretary pursuant to subsection (b) or (c) of this section, the completed study and engineering for an improvement to a harbor or an inland harbor, or separable element thereof, for the purpose of constructing such improvement and for which improvement a final environmental impact statement has been filed, shall be authorized to carry out the terms of the plan for such improvement. Any plan of improvement proposed to be implemented in accordance with this subsection shall be deemed to satisfy the requirements for obtaining the appropriate permits required under the Secretarys authority and such permits shall be granted subject to the non-Federal interests acceptance of the terms and conditions of such permits: Provided, That the Secretary determines that the applicable regulatory criteria and procedures have been satisfied. The Secretary shall monitor any project for which permits are granted under this subsection in order to ensure that such project is constructed (and, in those cases where such activities will not be the responsibility of the Secretary, operated and maintained) in accordance with the terms and conditions of such permits.
(e) Reimbursement 

(1) General rule 
Subject to the enactment of appropriation Acts, the Secretary is authorized to reimburse any non-Federal interest an amount equal to the estimate of Federal share, without interest, of the cost of any authorized harbor or inland harbor improvement, or separable element thereof, including any small navigation project approved pursuant to section 577 of this title, constructed under the terms of this section if
(A) after authorization of the project (or, in the case of a small navigation project, after completion of a favorable project report by the Corps of Engineers) and before initiation of construction of the project or separable element
(i) the Secretary approves the plans of construction of such project by such non-Federal interest, and
(ii) such non-Federal interest enters into an agreement to pay the non-Federal share, if any, of the cost of operation and maintenance of such project; and
(B) the Secretary finds before approval of the plans of construction of the project that the project, or separable element, is economically justified and environmentally acceptable.
(2) Matters to be considered in reviewing plans 
In reviewing such plans, the Secretary shall consider budgetary and programmatic priorities, potential impacts on the cost of dredging projects nationwide, and other factors that the Secretary deems appropriate.
(3) Monitoring 
The Secretary shall regularly monitor and audit any project for a harbor or inland harbor constructed under this subsection by a non-Federal interest in order to ensure that such construction is in compliance with the plans approved by the Secretary, and that costs are reasonable. No reimbursement shall be made unless and until the Secretary has certified that the work for which reimbursement is requested has been performed in accordance with applicable permits and the approved plans.
(f) Operation and maintenance 
Whenever a non-Federal interest constructs improvements to any harbor or inland harbor, the Secretary shall be responsible for maintenance in accordance with section 2211 (b) of this title if
(1) the Secretary determines, before construction, that the improvements, or separable elements thereof, are economically justified, environmentally acceptable, and consistent with the purposes of this subchapter;
(2) the Secretary certifies that the project is constructed in accordance with applicable permits and the appropriate engineering and design standards; and
(3) the Secretary does not find that the project, or separable element thereof, is no longer economically justified or environmentally acceptable.
(g) Demonstration of non-Federal interests acting as agent of Secretary 
For the purpose of demonstrating the potential advantages and efficiencies of non-Federal management of projects, the Secretary may approve as many as two proposals pursuant to which the non-Federal interests will undertake part or all of a harbor project authorized by Congress as the agent of the Secretary by utilizing its own personnel or by procuring outside services, so long as the cost of doing so will not exceed the cost of the Secretary undertaking the project.

33 USC 2233 - Coordination and scheduling of Federal, State, and local actions

(a) Notice of intent 
The Secretary, on request from an appropriate non-Federal interest in the form of a written notice of intent to construct a navigation project for a harbor or inland harbor under section 2232 of this title or this section, shall initiate procedures to establish a schedule for consolidating Federal, State, and local agency environmental assessments, project reviews, and issuance of all permits for the construction of the project, including associated access channels, berthing areas, and onshore port-related facilities, before the initiation of construction. The non-Federal interest shall submit, with the notice of intent, studies and documentation, including environmental reviews, that may be required by Federal law for decisionmaking on the proposed project. A State shall not be required to participate in carrying out this section.
(b) Procedural requirements 
Within 15 days after receipt of notice under subsection (a) of this section, the Secretary shall publish such notice in the Federal Register. The Secretary also shall provide written notification of the receipt of a notice under subsection (a) of this section to all State and local agencies that may be required to issue permits for the construction of the project or related activities. The Secretary shall solicit the cooperation of those agencies and request their entry into a memorandum of agreement described in subsection (c) of this section. Within 30 days after publication of the notice in the Federal Register, State and local agencies that intend to enter into the memorandum of agreement shall notify the Secretary of their intent in writing.
(c) Scheduling agreement 
Within 90 days after receipt of notice under subsection (a) of this section, the Secretary of the Interior, the Secretary of Commerce, the Administrator of the Environmental Protection Agency, and any State or local agencies that have notified the Secretary under subsection (b) of this section shall enter into an agreement with the Secretary establishing a schedule of decisionmaking for approval of the project and permits associated with it and with related activities. Such schedule may not exceed two and one-half years from the date of the agreement.
(d) Contents of agreement 
The agreement entered into under subsection (c) of this section, to the extent practicable, shall consolidate hearing and comment periods, procedures for data collection and report preparation, and the environmental review and permitting processes associated with the project and related activities. The agreement shall detail, to the extent possible, the non-Federal interests responsibilities for data development and information that may be necessary to process each permit, including a schedule when the information and data will be provided to the appropriate Federal, State, or local agency.
(e) Preliminary decision 
The agreement shall include a date by which the Secretary, taking into consideration the views of all affected Federal agencies, shall provide to the non-Federal interest in writing a preliminary determination whether the project and Federal permits associated with it are reasonably likely to receive approval.
(f) Revision of agreement 
The Secretary may revise the agreement once to extend the schedule to allow the non-Federal interest the minimum amount of additional time necessary to revise its original application to meet the objections of a Federal, State, or local agency which is a party to the agreement.
(g) Progress reports 
Six months before the final date of the schedule, the Secretary shall provide to Congress a written progress report for each navigation project for a harbor or inland harbor subject to this section. The Secretary shall transmit the report to the Committee on Public Works and Transportation of the House of Representatives and the Committee on Environment and Public Works of the Senate. The report shall summarize all work completed under the agreement and shall include a detailed work program that will assure completion of all remaining work under the agreement.
(h) Final decision 
Not later than the final day of the schedule, the Secretary shall notify the non-Federal interest of the final decision on the project and whether the permit or permits have been issued.
(i) Report on timesavings methods 
Not later than one year after November 17, 1986, the Secretary shall prepare and transmit to Congress a report estimating the time required for the issuance of all Federal, State, and local permits for the construction of navigation projects for harbors or inland harbors and associated activities. The Secretary shall include in that report recommendations for further reducing the amount of time required for the issuance of those permits, including any proposed changes in existing law.

33 USC 2234 - Nonapplicability to Saint Lawrence Seaway

Sections 2231, 2232, and 2233 of this title do not apply to any harbor or inland harbor project for that portion of the Saint Lawrence Seaway administered by the Saint Lawrence Seaway Development Corporation.

33 USC 2235 - Construction in usable increments

Any navigation project for a harbor or inland harbor authorized by this subchapter or any other provision of law enacted before, on, or after November 17, 1986, may be constructed in usable increments.

33 USC 2236 - Port or harbor dues

(a) Consent of Congress 
Subject to the following conditions, a non-Federal interest may levy port or harbor dues (in the form of tonnage duties or fees) on a vessel engaged in trade entering or departing from a harbor and on cargo loaded on or unloaded from that vessel under clauses 2 and 3 of section 10, and under clause 3 of section 8, of Article 1 of the Constitution:
(1) Purposes 
Port or harbor dues may be levied only in conjunction with a harbor navigation project whose construction is complete (including a usable increment of the project) and for the following purposes and in amounts not to exceed those necessary to carry out those purposes:
(A) 
(i) to finance the non-Federal share of construction and operation and maintenance costs of a navigation project for a harbor under the requirements of section 2211 of this title; or
(ii) to finance the cost of construction and operation and maintenance of a navigation project for a harbor under section 2232 or 2233 of this title; and
(B) provide emergency response services in the harbor, including contingency planning, necessary personnel training, and the procurement of equipment and facilities.
(2) Limitation on port or harbor dues for emer­gency service 
Port or harbor dues may not be levied for the purposes described in paragraph (1)(B) of this subsection after the dues cease to be levied for the purposes described in paragraph (1)(A) of this subsection.
(3) General limitations 

(A) Port or harbor dues may not be levied under this section in conjunction with a deepening feature of a navigation improvement project on any vessel if that vessel, based on its design draft, could have utilized the project at mean low water before construction. In the case of project features which solely
(i) widen channels or harbors,
(ii) create or enlarge bend easings, turning basins or anchorage areas, or provide protected areas, or
(iii) remove obstructions to navigation,

only vessels at least comparable in size to those used to justify these features may be charged under this section.

(B) In developing port or harbor dues that may be charged under this section on vessels for project features constructed under this subchapter, the non-Federal interest may consider such criteria as: elapsed time of passage, safety of passage, vessel economy of scale, under keel clearance, vessel draft, vessel squat, vessel speed, sinkage, and trim.
(C) Port or harbor dues authorized by this section shall not be imposed on
(i) vessels owned and operated by the United States Government, a foreign country, a State, or a political subdivision of a country or State, unless engaged in commercial services;
(ii) towing vessels, vessels engaged in dredging activities, or vessels engaged in intraport movements; or
(iii) vessels with design drafts of 20 feet or less when utilizing general cargo and deep-draft navigation projects.
(4) Formulation of port or harbor dues 
Port or harbor dues may be levied only on a vessel entering or departing from a harbor and its cargo on a fair and equitable basis. In formulating port and harbor dues, the non-Federal interest shall consider
(A) the direct and indirect cost of construction, operations, and maintenance, and providing the facilities and services under paragraph (1) of this subsection;
(B) the value of those facilities and services to the vessel and cargo;
(C) the public policy or interest served; and
(D) any other pertinent factors.
(5) Notice and hearing 

(A) Before the initial levy of or subsequent modification to port or harbor dues under this section, a non-Federal interest shall transmit to the Secretary
(i) the text of the proposed law, regulation, or ordinance that would establish the port or harbor dues, including provisions for their administration, collection, and enforcement;
(ii) the name, address, and telephone number of an official to whom comments on and requests for further information on the proposal are to be directed;
(iii) the date by which comments on the proposal are due and a date for a public hearing on the proposal at which any interested party may present a statement; however, the non-Federal interest may not set a hearing date earlier than 45 days after the date of publication of the notice in the Federal Register required by subparagraph (B) of this paragraph or set a deadline for receipt of comments earlier than 60 days after the date of publication; and
(iv) a written statement signed by an appropriate official that the non-Federal interest agrees to be governed by the provisions of this section.
(B) On receiving from a non-Federal interest the information required by subparagraph (A) of this paragraph, the Secretary shall transmit the material required by clauses (i) through (iii) of subparagraph (A) of this paragraph to the Federal Register for publication.
(C) Port or harbor dues may be imposed by a non-Federal interest only after meeting the conditions of this paragraph.
(6) Requirements on non-Federal interest 
A non-Federal interest shall
(A) file a schedule of any port or harbor dues levied under this subsection with the Secretary and the Federal Maritime Commission, which the Commission shall make available for public inspection;
(B) provide to the Comptroller General of the United States on request of the Comptroller General any records or other evidence that the Comptroller General considers to be necessary and appropriate to enable the Comptroller General to carry out the audit required under subsection (b)1 of this section;
(C) designate an officer or authorized representative, including the Secretary of the Treasury acting on a cost-reimbursable basis, to receive tonnage certificates and cargo manifests from vessels which may be subject to the levy of port or harbor dues, export declarations from shippers, consignors, and terminal operators, and such other documents as the non-Federal interest may by law, regulation, or ordinance require for the imposition, computation, and collection of port or harbor dues; and
(D) consent expressly to the exclusive exercise of Federal jurisdiction under subsection (c)1 of this section.
(b) Jurisdiction 

(1) The district court of the United States for the district in which is located a non-Federal interest that levies port or harbor dues under this section has original and exclusive jurisdiction over any matter arising out of or concerning, the imposition, computation, collection, and enforcement of port or harbor dues by a non-Federal interest under this section.
(2) Any person who suffers legal wrong or is adversely affected or aggrieved by the imposition by a non-Federal interest of a proposed scheme or schedule of port or harbor dues under this section may, not later than 180 days after the date of hearing under subsection (a)(5)(A)(iii) of this section, commence an action to seek judicial review of that proposed scheme or schedule in the appropriate district court under paragraph (1).
(3) On petition of the Attorney General or any other party, that district court may
(A) grant appropriate injunctive relief to restrain an action by that non-Federal interest violating the conditions of consent in subsection (a) of this section;
(B) order the refund of any port or harbor dues not lawfully collected; and
(C) grant other appropriate relief or remedy.
(c) Collection of duties 

(1)  2 Delivery of certificate and manifest 

(A) Upon arrival of vessel 
Upon the arrival of a vessel in a harbor in which the vessel may be subject to the levy of port or harbor dues under this section, the master of that vessel shall, within forty-eight hours after arrival and before any cargo is unloaded from that vessel, deliver to the appropriate authorized representative appointed under subsection (a)(6)(C) of this section a tonnage certificate for the vessel and a manifest of the cargo aboard that vessel or, if the vessel is in ballast, a declaration to that effect.
(B) Before departure of vessel 
The shipper, consignor, or terminal operator having custody of any cargo to be loaded on board a vessel while the vessel is in a harbor in which the vessel may be subject to the levy of port or harbor dues under this section shall, within forty-eight hours before departure of that vessel, deliver to the appropriate authorized representative appointed under subsection (a)(6)(C) of this section an export declaration specifying the cargo to be loaded on board that vessel.
(d) Enforcement 
At the request of an authorized representative referred to in subsection (a)(6)(C) of this section, the Secretary of the Treasury may:
(1) withhold the clearance required by section 60105 of title 46 for a vessel if the master, owner, or operator of a vessel subject to port or harbor dues under this section fails to comply with the provisions of this section including any non-Federal law, regulation or ordinance issued hereunder; and
(2) assess a penalty or initiate a forfeiture of the cargo in the same manner and under the same procedures as are applicable for failure to pay customs duties under the Tariff Act of 1930 (19 U.S.C. 1202 et seq.) if the shipper, consignor, consignee, or terminal operator having title to or custody of cargo subject to port or harbor dues under this section fails to comply with the provisions of this section including any non-Federal law, regulation, or ordinance issued hereunder.
(e) Maritime Lien 
Port or harbor dues levied under this section against a vessel constitute a maritime lien against the vessel and port or harbor dues levied against cargo constitute a lien against the cargo that may be recovered in an action in the district court of the United States for the district in which the vessel or cargo is found.
[1] See References in Text note below.
[2] So in original. No par. (2) has been enacted.

33 USC 2237 - Information for national security

Any non-Federal interest shall provide the United States the information necessary for military readiness planning and harbor, inland harbor, and national security, including information necessary to obtain national security clearances for individuals employed in critical harbor and inland harbor positions.

33 USC 2238 - Authorization of appropriations

(a) Trust fund 
There are authorized to be appropriated out of the Harbor Maintenance Trust Fund, established by section 9505 of title 26, for each fiscal year such sums as may be necessary to pay
(1) 100 percent of the eligible operations and maintenance costs of those portions of the Saint Lawrence Seaway operated and maintained by the Saint Lawrence Seaway Development Corporation for such fiscal year; and
(2) up to 100 percent of the eligible operations and maintenance costs assigned to commercial navigation of all harbors and inland harbors within the United States.
(b) General fund 
There are authorized to be appropriated out of the general fund of the Treasury of the United States for each fiscal year such sums as may be necessary to pay the balance of all eligible operations and maintenance costs not provided by payments from the Harbor Maintenance Trust Fund under this section.

33 USC 2239 - Repealed. Pub. L. 101640, title IV, 412(f), Nov. 28, 1990, 104 Stat. 4650

Section, Pub. L. 99–662, title II, § 211, Nov. 17, 1986, 100 Stat. 4106; Pub. L. 100–676, § 32, Nov. 17, 1988, 102 Stat. 4030, directed Administrator of Environmental Protection Agency to designate one or more sites for disposal of dredged material as an alternative to disposal at the Mud Dump in New Jersey.

33 USC 2240 - Emergency response services

(a) Grants 
The Secretary is authorized to make grants to any non-Federal interest operating a project for a harbor for provision of emergency response services in such harbor (including contingency planning, necessary personnel training, and the procurement of equipment and facilities either by the non-Federal interest, by a local agency or municipality, or by a combination of local agencies or municipalities on a cost-reimbursable basis, either by a cooperative agreement, mutual aid plan, or mutual assistance plan entered into between one or more non-Federal interests, public agencies, or local municipalities).
(b) Authorization of appropriations 
There is authorized to be appropriated for fiscal years beginning after September 30, 1986, and ending before October 1, 1992, $5,000,000.

33 USC 2241 - Definitions

For purposes of this subchapter
(1) Deep-draft harbor 
The term deep-draft harbor means a harbor which is authorized to be constructed to a depth of more than 45 feet (other than a project which is authorized by section 202 of this title).
(2) Eligible operations and maintenance 

(A) Except as provided in subparagraph (B), the term eligible operations and maintenance means all Federal operations, maintenance, repair, and rehabilitation, including
(i)  maintenance dredging reasonably necessary to maintain the width and nominal depth of any harbor or inland harbor;
(ii)  the construction of dredged material disposal facilities that are necessary for the operation and maintenance of any harbor or inland harbor;
(iii)  dredging and disposing of contaminated sediments that are in or that affect the maintenance of Federal navigation channels;
(iv)  mitigating for impacts resulting from Federal navigation operation and maintenance activities; and
(v)  operating and maintaining dredged material disposal facilities.
(B) As applied to the Saint Lawrence Seaway, the term eligible operations and maintenance means all operations, maintenance, repair, and rehabilitation, including maintenance dredging reasonably necessary to keep such Seaway or navigation improvements operated or maintained by the Saint Lawrence Seaway Development Corporation in operation and reasonable state of repair.
(C) The term eligible operations and maintenance does not include providing any lands, easements, or rights-of-way, or performing relocations required for project operations and maintenance.
(3) General cargo harbor 
The term general cargo harbor means a harbor for which a project is authorized by section 202 of this title and any other harbor which is authorized to be constructed to a depth of more than 20 feet but not more than 45 feet;
(4) Harbor 
The term harbor means any channel or harbor, or element thereof, in the United States, capable of being utilized in the transportation of commercial cargo in domestic or foreign waterborne commerce by commercial vessels. The term does not include
(A) an inland harbor;
(B) the Saint Lawrence Seaway;
(C) local access or berthing channels;
(D) channels or harbors constructed or maintained by nonpublic interests; and
(E) any portion of the Columbia River other than the channels on the downstream side of Bonneville lock and dam.
(5) Inland harbor 
The term inland harbor means a navigation project which is used principally for the accommodation of commercial vessels and the receipt and shipment of waterborne cargoes on inland waters. The term does not include
(A) projects on the Great Lakes;
(B) projects that are subject to tidal influence;
(C) projects with authorized depths of greater than 20 feet;
(D) local access or berthing channels; and
(E) projects constructed or maintained by nonpublic interests.
(6) Nominal depth 
The term nominal depth means, in relation to the stated depth for any navigation improvement project, such depth, including any greater depths which must be maintained for any harbor or inland harbor or element thereof included within such project in order to ensure the safe passage at mean low tide of any vessel requiring the stated depth.
(7) Non-Federal interest 
The term non-Federal interest has the meaning such term has under section 1962d–5b of title 42 and includes any interstate agency and port authority established under a compact entered into between two or more States with the consent of Congress under section 10 of Article I of the Constitution.
(8) United States 
The term United States means all areas included within the territorial boundaries of the United States, including the several States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Trust Territory of the Pacific Islands, the Northern Mariana Islands, and any other territory or possession over which the United States exercises jurisdiction.

33 USC 2242 - Remote and subsistence harbors

(a) In general 
In conducting a study of harbor and navigation improvements, the Secretary may recommend a project without the need to demonstrate that the project is justified solely by national economic development benefits if the Secretary determines that
(1) 
(A) the community to be served by the project is at least 70 miles from the nearest surface accessible commercial port and has no direct rail or highway link to another community served by a surface accessible port or harbor; or
(B) the project would be located in the State of Hawaii, the Commonwealth of Puerto Rico, Guam, the Commonwealth of the Northern Mariana Islands, the United States Virgin Islands, or American Samoa;
(2) the harbor is economically critical such that over 80 percent of the goods transported through the harbor would be consumed within the community served by the harbor and navigation improvement; and
(3) the long-term viability of the community would be threatened without the harbor and navigation improvement.
(b) Justification 
In considering whether to recommend a project under subsection (a), the Secretary shall consider the benefits of the project to
(1) public health and safety of the local community, including access to facilities designed to protect public health and safety;
(2) access to natural resources for subsistence purposes;
(3) local and regional economic opportunities;
(4) welfare of the local population; and
(5) social and cultural value to the community.